INTERCHAR 973 PDF

Interchar , Interchar , Interchar , Interchar and Interchar Interchar can be specified for structural beams, columns and. This approval relates to the use of Interchar for the fire protection of of Interchar (excluding primer and top sealer) required to provide. Interchar | Anti-corrosion solutions | Adress A. Kojelavičiaus g. 17, LT Vilnius.

Author: Gular Necage
Country: Anguilla
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 28 July 2012
Pages: 104
PDF File Size: 15.1 Mb
ePub File Size: 20.97 Mb
ISBN: 828-2-65073-657-3
Downloads: 38820
Price: Free* [*Free Regsitration Required]
Uploader: Mukora

793 Type of building material: It is the responsibility of the design engineer. FRP fire attack from either above or below in terms of loadbearing capacity, integrity and insulation.

The testing programme and assessment procedures are designed to utilise the critical temperature obtained from tests on fully loaded steel members.

Another major difference between European and UK testing is in the type of furnace thermocouple used. As with standard down-stand beams. The steel framework of the floor shall be designed to be able to bear the specified uniformly distributed imposed load of iterchar to a maximum of 10kPa. Stagger position of noggins on opposite webs. No readings shall normally be taken within 25mm of edges.

Paints-AkzoNobel

The deck is then filled with in-situ concrete. The current European fire test standard ENV is in the course of being revised and is expected to be reissued as two separate standards. The intumescent coating around the remaining bottom flange thermocouples must also be treated in a similar manner.

The physical filling of the void is not necessary. Cafco International Monokote MK Any specified design or regulatory requirements for the insulation and integrity of compartment walls and floors. FRP in screw-fix Vicuclad system. Also defined is an evaluation of reactive systems against a slow heating regime lnterchar may be required in some areas of Europe such as Germany.

  108 046F PDF

The information contained in this data sheet is liable to modification from time to time in the light of experience and our policy of continuous development.

European methods of assessing fire protection materials have been developed. Additional mechanical fixing None within the scope of the following table 8. Where it is required that both beams and columns are to be assessed the assessment shall be based on the data obtained from testing at least one loaded beam.

Edgefix this horizontal board to the two vertical boards using either self-drilling Knauf Intercha Gripper Screws at mm centres or staples at mm centres.

Required thickness of fire-resisting material should be in accordance with Figure 3 in the report no. Part 20 Method of determination of the fire resistance of elements of construction general principles Part 21 Method of determination of the fire resistance of load-bearing elements of construction Whilst BS Part 20 is concerned with general principles and covers requirements which are common to the other Parts of BS IntercharInterchar und Interchar Steel preparation requirements Remove oil.

The resultant measurements will be averaged as separate zones. Durability Resistant to short interrchar moisture exposure. Store in dry, shaded conditions away from sources of. Unprec- edented durability provides for robust Association for Specialist Fire Protection 48 Fire protection for structural steel in buildings th www.

The issue is discussed further in Section 6.

The Ceilcote M application shall be conducted by the Applicator Company using employees. Additional mechanical fixing For 3-sided applications.

Application technique Air-borne spray mixed with water at gun 6.

Interpolation is permissible to determine thickness. CP March April Updated information on place of manufacture to be provided by the manufacturer. In order to do this the following steps should be applied: Leighs Paints Firetex FX Availability Main insulation stockists — Fixing recommended by recognised fire protection contractors 4. All dimensions in mm. It is willing to make its specialist knowledge on all aspects of fire protection and can assist specifiers and main contractors in identifying products suitable for specific requirements, both in the UK and related overseas markets.

  EXYNOS 4412 DATASHEET PDF

The procedure is in two parts. Design of steel structurs Part 1. De tool Brandwerende coatings biedt u online, 24 uur per dag, assistentie bij de keuze van brandwerende-coatingproducten.

The method of calculating section factor AND fire protection thickness for cellular beams is considered to be different than for other solid steel sections. Required thickness of fire-resisting material should be in accordance with Table 5 in the report no. The data is only correct at the dates of the fire assessment and acceptance into this publication.

Catalog | Kaung United Co.,Ltd

Orientation Plane in which the exposed face of the test specimen is located. The lowest storey will be the highest loaded but the upper storey will be very lightly loaded.

The thermal data from the asymmetrical short sections is not used in the web post line calculation. Ceilcote M is recommended for application as a primer for steel and as a concrete sealer where. On site use For internal and semi exposed applications The Ceilcote M application shall be conducted by the Applicator Company using employees trained in the appropriate application procedures.

Stud weld pins at mm centres.

admin